Uncategorized

Carnival Mardi Gras Pool Transformation

Overview Initial assessment identified multiple high-traffic aquatic zones across the Carnival Mardi Gras requiring surface enhancement to improve safety, comfort, and long-term performance. In collaboration with Life Floor, a comprehensive pool deck refresh was executed across key guest areas. The project focused on upgrading surfacing systems in both recreational and relaxation zones, ensuring each space […]

Carnival Mardi Gras Pool Transformation Read More »

Aluminum Folding Platform Fabrication & Installation

Full Sail Marine (FSM) was contracted to design, fabricate, and install a CLASS-approved aluminum folding platform to integrate with the vessel’s existing tender access ladder. The objective was to deliver a structurally compliant and operationally efficient solution aligned with marine regulatory standards. The project involved full engineering development, including design in accordance with MSC.1/Circular 1331

Aluminum Folding Platform Fabrication & Installation Read More »

FSM Skyward Funnel Maintenance Project

Initial assessment identified priority areas on the top-of-funnel (top wing) requiring immediate surface treatment. During a scheduled dry-dock period, Full Sail Marine (FSM) was engaged to perform inspection and maintenance work on the vessel’s funnel system. The project focused on addressing priority areas identified on the top-of-funnel (top wing), where surface degradation required immediate attention

FSM Skyward Funnel Maintenance Project Read More »

CRUISE SHIP WATERPARK REPAIR & REFURBISHMENT

In the spring of 2023, Full Sail Marine (FSM) completed a comprehensive repair and refurbishment project for a major cruise line. The project, requested by the Technical Operations Manager, aimed to improve issues with several key attractions, including the “Perfect Storm” Waterpark Slides, “Space Hole”, and the Splash Away Bay/Baby Bay. To revitalize the attractions,

CRUISE SHIP WATERPARK REPAIR & REFURBISHMENT Read More »